|
Area 1: The culvert that carries water under Stone Crop
Way will be flushed of dirt and debris to allow water to flow along its intended
course. Any disturbed ground will be re-vegetated with the Genesee grass
seed mix. |
Area 2: The erosion control work at this location
includes extending the upper culvert from Montane Drive East and backfilled.
A rip rap basin matching the lower culvert in the area will be used to prevent
future erosion problems. The area will be re-vegetated with the Genesee
grass seed mix. |